Convect AI
Core use case · AI production scheduling

Schedules that fix themselves when the plant changes

Not an algorithm bolted onto a spreadsheet. Convect understands your lines, routings, materials and constraints, builds the best schedule in minutes, and lets agents replan around every disruption.

90%+
Faster plan creation
15–30%
Better on-time delivery
5–15%
Higher capacity utilization

Sound familiar?

Is this still how you schedule?

Spreadsheet scheduling

Planners iterate by hand across workbooks; change one order and everything else moves.

Impact: Hours per schedule, frequent errors, slow to react

An APS that didn’t stick

The system never understood the plant’s real constraints, so plans weren’t executable — and everyone went back to Excel.

Impact: Big spend, little value, IT and ops blaming each other

Every rush order is a fire drill

A hot order means half a day of rescheduling — and the knock-on effects still get missed.

Impact: Late deliveries, wasted capacity, unhappy customers

Siloed plans

Production, materials and purchasing are planned by different people in different tools and never quite line up.

Impact: Low kit-complete rates, excess stock, line stoppages

The root cause usually isn’t the algorithm. It’s that the system doesn’t understand your plant. Convect starts there.

Capabilities

End-to-end planning and scheduling

From the master schedule to the shop floor to replanning when things go wrong — every step covered.

01

Master production scheduling

Capacity allocation and balancing across plants and periods, with scenario comparison

OntologyOptimization
02

Finite-capacity scheduling

Line- and workstation-level schedules, down to the hour or minute

OntologyOptimization
03

Material kitting checks

Material availability verified before release; schedules adjust automatically on shortage

OntologyAgents
04

Capacity load analysis

See bottlenecks and simulate adding or removing capacity

OntologyOptimization
05

Multi-plant coordination

Orders allocated across plants to balance capacity and logistics cost

OntologyOptimization
06

Dynamic replanning

Rush orders, breakdowns and late materials replanned automatically, with minimal disruption

AgentsOptimization

Industry fit

Every industry schedules differently

Same engine, a different ontology for each.

Industrial equipmentElectronicsMachiningFood & beverageCPG
Production typeEngineer-to-order / discreteDiscrete / mixed-modeDiscrete job shopProcess / batchProcess / batch
Key constraintsProject milestones, assembly kittingSMT capacity, alternate partsFlexible routings, toolingShelf life, CIP / allergen cleansPromotions, freshness
Planning granularityWeek / dayDay / shiftDay / hourBatch / shiftDay / week
BOM complexityDeep, multi-levelDeep, many alternatesShallow (operation-driven)Medium (recipes)Shallow (packaging-driven)
Rush-order frequencyLow (but high impact)HighHighMedium (seasonal)High (promotion-driven)
Ontology highlightsProject WBS + material networkAlternates graph + ECO versionsRouting graph + capability matrixRecipes + lot tracing + clean rulesChannels + promo calendar + freshness

Multi-agent workflow · Rush order

See it work

What you’ll see in a demo

  1. 1Load data from Excel or your ERP → the ontology is built from it
  2. 2The optimizer generates the schedule → shown as an interactive Gantt
  3. 3Drop in a rush order → agents replan and compare before vs. after
  4. 4Review the impact → cost, on-time delivery and utilization side by side

Fast rollout

From spreadsheets to AI scheduling in 6 weeks

Connect your data, let the system model your constraints, and see optimized schedules — results in as little as six weeks.

  1. 1

    Connect your data

    Import Excel or connect your ERP

  2. 2

    Model your plant

    The ontology captures your scheduling constraints

  3. 3

    Get optimal schedules

    Optimized in minutes, kept current by agents

Start scheduling with AI agents

Get our production scheduling playbook, or book a demo on a scenario from your plant.