Keep engineer-to-order projects on schedule — even when everything changes

From turnkey production lines to precision instruments, Convect models your deep BOMs and project milestones, and its agents replan the shop the moment an engineering change, late part or rush service order lands.

The challenge

What makes industrial equipment planning hard

Plans drift away from project milestones

Orders ship as projects, but the shop schedule isn’t tied to milestones — so components finish while final assembly waits.

Deep BOMs, constant engineering changes

Multi-level BOMs change mid-project. After every MRP run, planners spend days manually checking what actually changed.

Long-lead materials surprise you

Critical parts take months to source, and shortages often surface only when the job is about to start.

Aftermarket competes with new builds

Spare parts and service demand is lumpy and fights new equipment for the same capacity.

Agents at work

What your planning agents handle in industrial equipment

Real situations your planners deal with every week — picked up, analyzed and turned into an explained recommendation without anyone having to notice them first.

An engineering change hits a sub-assembly

Disruption Response Agent

Traces every affected work order through the BOM, replans only those, and shows the impact on each project milestone.

“Can we ship unit 14 two months early?”

Root-Cause Agent

Checks the contract, capacity and engineering readiness along the ontology and answers with a checkable chain of reasoning — not a guess.

A long-lead casting slips three weeks

Coordination Agent

Flags the projects at risk, proposes resequencing or expediting options, and loops in procurement with the numbers.

How planning agents work →

Industry ontology

An ontology built for industrial equipment

On top of the core model of products, lines, materials and orders, Convect adds the entities and constraints specific to industrial equipment — so agents understand your business from day one.

What this means for you

Project WBS + material network — once these relationships are in the model, the impact of any change (a rush order, a shortage, a breakdown) is traced automatically and handed to the optimizer as constraints.

1

Project WBS

Work breakdown structure as planning nodes, linked to shop orders

2

Kitting network

Multi-level supplier → warehouse → line checks for major assemblies

3

Milestone constraints

Delivery dates scheduled backward into latest start dates for every node

4

Aftermarket capacity pool

Shared capacity with service parts, with priorities and reserved share

The decisions we optimize

From project milestones to the shop floor: five decisions

From long-range planning to the shop floor, each layer’s output becomes the next layer’s constraint.

01Project · long horizon

Component requirements

Decision

Which major components each project needs, when they must be ready, make or buy

Output

Component need dates scheduled back from milestones

02Plant · weekly

Routing allocation

Decision

Which plant and routing each component takes, and which operations are subcontracted

Output

Plant assignments and routings

03Plant · weekly

Engineering readiness

Decision

When drawings, process plans, tooling and NC programs will be done

Output

A schedule of engineering prerequisites before release

04Plant · weekly

Plant master schedule

Decision

Which components each plant starts each week; how to balance load; overtime or subcontract

Output

A kitted, executable weekly plan per plant

05Machine / cell · day · shift

Daily shop schedule

Decision

Operation sequence, machine and crew assignment; replanning for rush orders and breakdowns

Output

Machine-level daily schedule and dispatch list

Constraints across the chain:Backward scheduling from milestonesMulti-level BOM kittingLong-lead material alertsAftermarket capacity poolEngineering change impact

Upstream decisions constrain downstream ones. When execution drifts, agents trace back up the chain and assess the impact automatically.

Product preview · Industrial equipment

Plant master schedule: load and project milestones on one screen

Capabilities

Planning capabilities built for industrial equipment

Project-driven master schedule

Production planned backward from project milestones; milestones and shop orders stay linked

Multi-level BOM kitting

Shortage risk traced down every BOM level, with early warnings on long-lead items

Capacity load visibility

Bottleneck operations and resource conflicts surfaced; overtime and subcontracting simulated

Aftermarket + new-build scheduling

Shared capacity allocated by priority and reserved share

Production typeKey constraintsPlanning granularityBOM complexityRush-order frequencyOntology highlights
Engineer-to-order / discreteProject milestones, assembly kittingWeek / dayDeep, multi-levelLow (but high impact)Project WBS + material network

See also: Production planning & scheduling · How the platform works

Customer results

Results from the industry

Industrial equipment manufacturer

Production scheduled backward from project milestones, with multi-level BOM kitting and capacity load analysis connected in one model.

80%

Less time building plans

65% → 85%

Kit-complete rate

+20%

On-time project delivery

Geely logo

Geely Holding Group

A multi-tier automotive parts network connecting suppliers, parts warehouses and vehicle plants, optimized end to end.

Multi-tier

Parts network model

Lower

Transport cost

Read the story

Standards

Configured for industrial equipment requirements

During implementation, we configure the model around the quality systems and standards you operate under:

ISO 9001

Quality management

AS9100

Aerospace quality (where applicable)

PMBOK / PRINCE2

Project management

Put planning agents to work in industrial equipment

Get the Industrial Equipment Planning Playbook, or talk to a specialist who knows industrial equipment planning.