Job-shop flexibility, scheduled with precision

Lathes, mills, grinders — every machine is different and every part can take more than one route. Convect models your machine capabilities and tooling, and its agents keep the schedule feasible when a spindle goes down or a rush job comes in.

The challenge

What makes machining planning hard

Flexible routings

The same part can take several routings across machines with different capabilities — picking the best one is a puzzle.

Versatile machines, costly setups

A machine can run many parts, but switching means new tools and fixtures — setup time has to be planned.

Outside processing

Heat treat, plating and other subcontracted steps have to dovetail with in-house operations.

Tooling and fixture limits

Specific parts need specific tools and fixtures; wear and availability directly constrain the schedule.

Agents at work

What your planning agents handle in machining

Real situations your planners deal with every week — picked up, analyzed and turned into an explained recommendation without anyone having to notice them first.

A 5-axis mill goes down for two days

Disruption Response Agent

Moves qualified jobs to alternate machines and routings, and flags the few that truly can’t move.

A fixture is found worn at inspection

Coordination Agent

Re-sequences jobs that need it, and checks whether a second fixture or an alternate routing keeps due dates.

Heat-treat vendor pushes a lot by a week

Root-Cause Agent

Shows exactly which orders slip and why, with options to expedite or resequence downstream operations.

How planning agents work →

Industry ontology

An ontology built for machining

On top of the core model of products, lines, materials and orders, Convect adds the entities and constraints specific to machining — so agents understand your business from day one.

What this means for you

Routing graph + capability matrix — once these relationships are in the model, the impact of any change (a rush order, a shortage, a breakdown) is traced automatically and handed to the optimizer as constraints.

1

Routing graph

Alternative paths, mandatory and optional operations for each part

2

Machine capability matrix

Which parts each machine can run, tolerance ranges and speeds

3

Tooling & fixtures

Part–tool–fixture pairings with availability checks

4

Outside processing network

Subcontractor capacity, lead times and quality history

The decisions we optimize

From process planning to the hour-by-hour schedule: five decisions

From long-range planning to the shop floor, each layer’s output becomes the next layer’s constraint.

01Process planning · weekly

Routing selection

Decision

Choose the best routing for each part based on machine capability

Output

The most efficient routing per part

02Shop · daily

Machine load allocation

Decision

Spread work across machines to avoid bottlenecks

Output

Balanced load, bottlenecks removed

03Shop · daily

Tooling & fixture kitting

Decision

Verify part–tool–fixture pairings and wear before release

Output

Jobs released only when tooling is ready

04Shop · daily

Outside processing

Decision

Coordinate subcontractor capacity, lead time and quality with in-house steps

Output

Higher on-time rate for subcontracted operations

05Machine · hourly

Shop schedule

Decision

Hour-level machine schedule; fast replanning for rush jobs

Output

Machine-level schedule to the hour

Constraints across the chain:Routing graphMachine capability matrixTooling & fixture constraintsOutside processing networkSetup optimization

Upstream decisions constrain downstream ones. When execution drifts, agents trace back up the chain and assess the impact automatically.

Capabilities

Planning capabilities built for machining

Dynamic routing optimization

Best routing picked automatically for every part

Machine load balancing

Work spread across machines to relieve bottlenecks

In-house + outside processing

Internal and subcontracted operations timed to fit

Tooling & fixture checks

Tool and fixture availability verified before release

Production typeKey constraintsPlanning granularityBOM complexityRush-order frequencyOntology highlights
Discrete job shopFlexible routings, toolingDay / hourShallow (operation-driven)HighRouting graph + capability matrix

See also: Production planning & scheduling · How the platform works

Customer results

Results from the industry

Precision machining company

Routings matched to machine capabilities dynamically, similar parts grouped to cut setups, and outside processing synchronized automatically.

+12%

Machine utilization

−25%

Setup time

+18%

On-time delivery

Standards

Configured for machining requirements

During implementation, we configure the model around the quality systems and standards you operate under:

ISO 9001

Quality management

AS9100

Aerospace (where applicable)

IATF 16949

Automotive parts (where applicable)